CHALLENGES / PROBLEMS
- The possibility of pollution of groundwater and watercourses of the Sava River and the Black Sea basin requires the construction of a sewerage system with a wastewater treatment plant
- Implementation of a management and control system for technological equipment for primary and secondary wastewater treatment, which is fully in line with the requirements defined in the technological project for the “SBR” type of water treatment plant
- The need for the control system to be safe, reliable, flexible, easy to operate and to allow easy change of plant operating parameters